The Distribution Piping System (DPS) from Lakeland Sawmill to the Energy Centre, City Hall, Civic Centre, Coliseum, Art Gallery, and the Four Seasons Pool was completed May 2012 and each building contains Energy Transfer Stations. These provide hot water to the District during times when Lakeland Mills is shut down for routine maintenance or during very cold weather when there is high demand for heat. The Downtown Energy Centre was completed in 2012 and houses the City's distribution pumps and peaking backup natural gas-fired boilers.
0 Comments
Leave a Reply. |